# EOM Material Transfer
|
|
|
|
## Overview
|
|
|
|
Below we will describe the process to transfer material to the next month.
|
|
|
|
This process will help improve the material consistency of our materials and make sure all reporting is as accurate as possible.
|
|
|
|
This process effects the outcome of how the data looks in alplamart as well as our kpi's.
|
|
|
|
Special notes to this process. The eom transfer toggle will only be active for 1 hour on the 1st of the month.
|
|
|
|
Example your plants shift time is 7am the Toggle will only work from 6am to 7am.
|
|
|
|
The logic to this process.
|
|
|
|
When you transfer the material weather its to the same lot of a new one it will be returned to the stock, you will see this as a reprint and return to FM1.
|
|
|
|
after the allowed time is up the material will then be re-consumed automatically to the lot you entered into the form.
|
|
|
|
## Transferring material
|
|
|
|
Please head over to lst and click on the materials tab on the left.
|
|
|
|
If your side bar is collapsed its the icon that looks like a box
|
|
|
|

|
|
|
|
once on this page scroll to the bottom.
|
|
|
|
- Click the actual amount tab
|
|
- Toggle the eom transfer
|
|
|
|

|
|
|
|
1. Pull the gaylord of material off the line and weight it
|
|
|
|
2. Enter the amount into the actual amount field
|
|
|
|
3. Enter the running number of the label on the gaylord.
|
|
|
|
- there is no way around this you will be required to had a running number
|
|
|
|
4. Enter the lot number you will be transferring the material too
|
|
|
|
- This can be the same lot you are currently on if it would continue past the allowed time. example the lot goes until 10am on teh 1st you would use the current lot for this transfer
|
|
|
|
5. Press Transfer to lot
|